Monday, January 19, 2009

Bombing the Bathroom

It's been a long week and as you can tell I've been pretty busy. The bathroom has been the focus this week since it's really all that is left in the major construction picture.

So, after cleaning up the mess from the weekend Monday and Tuesday, I dug into the bathroom on Wednesday night. I quickly found that Travis's work over the holidays eased the process since most of what was left was plaster on lath and some tile on tileboard.

The shower wall proved to be the most difficult as the tile was on a greenboard and cementboard in some places.

Friday night I finished up the demo and Saturday was spent bagging what was left up and working on electrical and insulation. Sunday was more electrical which resulted in two trips to Home Depot which took forever compliments of slow work on the A train.

I woke up early today to tidy things up and get ready for Roy to help me hand the ceiling drywall. It took us 2 hours to cut the drywall and hang it with the main challenge being working in such a small space with one person on a ladder in the bath tub, another on a sawhorse and attempting to vault it up around corners and over the steam pipe.

After a bit of struggling, we got it all into place and it feels good to have gone from demo to insulated, re-wired with a ceiling in less then a week.

Still, there is a lot of work to do so I can get a sink back and not have to take baths (I've never taken so many baths in my life as I have this week!). It looks like the plumbing for the bath tub will need to be replaced and the subfloor has holes and oddities around the edges.



I have a few contractors coming this week to look at these elements and give their opinion.

In the meantime, I'll haul the bombed out debris to the curb each night this week and shop for tiles.

No comments: