I've been able to get all the framing in the bathroom up this week and it's looking fairly plumb. Like the ceiling, the lathe has come in handy to level out the shower wall. I was concerned about being able to conceal the cold water plumbing. The main riser is by the toilet and runs all the way around the bathroom to the tub and sink, but I seem to have framed it all out just enough to hide all the copper.
The other small challenge was deciding what to do for a medicine cabinet. The surface mounted one looked hideous before and I didn't want to integrate it with a mirror. I've seen some neat ones online that are concealed by a picture frame, but they were too deep for my shallow NYC walls and far too expensive. For the moment I've framed out my an area beside the sink for a custom medicine cabinet when I get around too it. I just need to cut a bit of laminated wood to fit in there, so it should be fairly easy when the time is right.
So now it's time for drywall and tileboard. I'll tackle this over the next few weeks as I'm traveling quite a bit still and I want to use that time to get the floors refinished. Time to start stacking everything into the bedroom! Yikes!
Subscribe to:
Post Comments (Atom)
1 comment:
nice post Flooring Renovation kindly visit us
Post a Comment