Sunday, December 21, 2008

"Trucking" Ahead

I can't believe how fast the past few weeks have gone by. A lot of work has been done with help from many hands, and trucks. I've been in the local ZipCar Toyota Tacoma all too much in the past 4 weeks. I think that I may be the only person renting it as the mirrors and seat position always seem adjusted perfect for me.

Yet, while the price of gas has gone down the cost to rent the ZipCar hasn't, nor has drywall and other construction materials. Yet, just about everything I need to finish the major construction is in the apartment now.

The plumbing was even finished on the 16th. The sink was successfully moved over 2.5' I know, it was probably dumb for me to pay that much to move the sink over but I really feel it is going to make a world of difference.


Although the plumbing is in, my permits haven't cleared yet compliments of someone else in my building who has a violation for construction without a permit...grrrr.

The lesson of the week has been to relate the finishes to the placement of the infrastructure. In my hurry to get the electrical done on the last visit from the Michigan crew I forgot about the mounting height of the outlet boxes in relation to the picture frame molding. Long story short, I ended up moving every electrical box down a few inches...which proved to be difficult for some.

Despite my earlier lack of attention to detail, everything else has been moving forward. The last of the drywall was hauled up on Wednesday night last week and I began to hang it last weekend. More was tackled this weekend and I'm really happy with how the room has been shaping up. I spent a fair amount of time last week running all the power and light switches to the island position.

Today was a bit frustrating as I tackled re-doing the 2x4 framing for the kitchen wall. The pipe re-routing threw a bit of a kink into the original location for 2x4's, but I think I worked out a decent solution. My internal interior designer started thinking about whether or not to extend the wall to the door or stop it at the drain pipe. I'm pretty sure that I'm going to extend it to the door but I'll sleep on it tonight.

Finally, I wired up everything for the kitchen - 2 counter outlets, 1 dishwasher whip (loose wires), 1 stove outlet and one whip for a range hood.

All this took much more time then expected so my ambitions to finish the ceiling were kill joyed.

Yet, I have started a bit of mudding and plan to do more this week in preparation for Dad and Co. arrival on Friday. The ideal plan would be to have everything mudded before they get here so we can sand, prime, install wood floor and demo the bathroom walls/floor.

More to come this week.

Monday, September 29, 2008

Mud mud mud mud mud....

Progress is slow and the mud keeps flowing. Yet, this week is the final push before the "big sand" on Friday and the "posh paint" on Saturday and Sunday.

That's right, Dad is coming into town again and he's bringing the drywall primer. Yet, I still have a bit of work to do. I made a good push this week and weekend again, getting mud on almost every last bit, minus a few closet corners. All the closet drywall is glued up, after a tight ride in the Honda Element from Home Depot to get some more drywall. The Peel Away was brought back from the dead to finish off the front closet door frame. Exciting!

Unfortunately, my absent mind won again and I forgot to buy more mud so now it will be a chore to carry it from Home Depot on 23rd St. which is never fun. Luckily, I'll only need to get 2 more bags to finish the job.

Look for a big progress post after next weekend...

Friday, July 25, 2008

ZipCar to the Rescue!

Last night I realized, yet again, that I wasn't going to have enough supplies and that I'm not ready for my Dad's arrival tomorrow evening. I ran out of furring strips the night before and not all of the insulation is in the walls.

ZipCar to the rescue! I hopped into a Tacoma pickup truck and made my way to Yonkers. After buying 4 bundles of furring strips, a bag of durabond, 5 boxes of 32 gallon contractor bags (you have no idea how hard these are to find) and one 12 pack of Coke (yeah, fuel for the weekend) I made my way back to Manhattan.

By 10 PM I was unloaded and had brought everything up to the apartment. I started into putting the furring strips up by 10:30 PM and had to saw a bit. Given the crap I've gone through with the co-op and the storage installation lately, a bit of noise at this hour should be tolerated by my neighbors.

By 1 AM, I was done. All the insulation is out of the bags and I have room to work again. Yeah!