Despite the large task at hand and lacking troops to help, I dug in at 9 AM on Saturday chipping away at the plaster. Jen came around 1 PM just as I was loosing some steam and revitalized me with a breakfast sandwich. We continued to work and by 5:30 PM the ceiling was down.
Today was more of a cleanup day, having given the dust a day to settle and just the need to not live in a construction site. After 4 hours most everything was spick and span and 2/3 of the kitchen floor was ripped up (I plan on replacing this with oak to match the living room floor).

The worst part about the demo was tearing down the lath. There was a lot of dust and debris in the ceiling void compared to the wall. The air was thick and my hair was disgusting. Black water was pouring off of me for 10 minutes in the shower! I don't remember it being so bad when I did the bedroom, but maybe that's because I just tore into the walls and ceiling ruthlessly and expected the mess.
Anyhow, I'm super glad this part is done in just two short weekends. The bathroom is the only room left to be demolished.
The bags of plaster and wood are stacked up ready to go. I was hoping to rent a dumpster this weekend but didn't have the troops to back it up, so will schedule that date soon.

Oh, and don't forget to take in the spirit of all this with the new portrait.
No comments:
Post a Comment